Line 1:
Line 1:
<p>Infiltration of stormwater into underlying soils is one the Priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
<p>Infiltration of stormwater into underlying soils is one the Priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
−
*[[Infiltration Trenches and Chambers|Infiltration trenches and chambers]] (underground)
+
*[[Infiltration Infiltration chambers and trenches]] (underground)
−
*[[Infiltration Basins|Infiltration basins]] (surface)
+
*[[Infiltration basins]] (surface)
*[[Bioretention cells]] (surface)
*[[Bioretention cells]] (surface)
*[[Bioswales]] (surface)
*[[Bioswales]] (surface)