Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  +
<p>Infiltration of stormwater into underlying soils is one the Priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets. 
 +
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
 +
*[[Infiltration Trenches and Chambers|Infiltration trenches and chambers]] (underground)
 +
*[[Infiltration Basins|Infiltration basins]] (surface)
 +
*[[Bioretention cells]] (surface)
 +
*[[Bioswales]] (surface)
 +
}}
 +
 +
 
===Potential Constraints===
 
===Potential Constraints===
 
<ol>
 
<ol>
8,255

edits

Navigation menu