Line 1:
Line 1:
−
<p>Infiltration of stormwater into underlying soils is one the Priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
+
<p>Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
−
*[[Infiltration Infiltration chambers and trenches]] (underground)
+
*[[Infiltration chambers and trenches]] (underground)
*[[Infiltration basins]] (surface)
*[[Infiltration basins]] (surface)
*[[Bioretention cells]] (surface)
*[[Bioretention cells]] (surface)
*[[Bioswales]] (surface)
*[[Bioswales]] (surface)
}}
}}
−
+
</p>
−
===Potential Constraints===
===Potential Constraints===
<ol>
<ol>