Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  
<p>Infiltration of stormwater into underlying soils is one the Priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.   
 
<p>Infiltration of stormwater into underlying soils is one the Priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.   
 
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
 
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:
*[[Infiltration Trenches and Chambers|Infiltration trenches and chambers]] (underground)
+
*[[Infiltration Infiltration chambers and trenches]] (underground)
*[[Infiltration Basins|Infiltration basins]] (surface)
+
*[[Infiltration basins]] (surface)
 
*[[Bioretention cells]] (surface)
 
*[[Bioretention cells]] (surface)
 
*[[Bioswales]] (surface)
 
*[[Bioswales]] (surface)
8,255

edits

Navigation menu