All public logs
Jump to navigation
Jump to search
Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 18:22, 5 December 2022 192.139.27.23 talk submitted feedback post #06138e1... on Wetlands: Plants
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Geotextiles: Installation (content was: "Geotextiles are filter fabrics that can be installed to separate dissimilar soils and prevent the migration of materials. Geotextiles are recommended for installation at the bottom and side limits of the LID feature and should be implemented at the discretion of the engineer. '''Construction Steps:''' #Roll out fabric on the flattened sub-grade surfac...", and the only contributor was "SamanthaPelayo" (talk))
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Underdrains: Installation (content was: "300px|thumb|right|Underdrain installed to subgrade. (Photo Source: CVC, 2010) 300px|thumb|right|Underdrain installed with maintenance risers. Note the 'T' joints, which are no longer recommended. (Photo Source: CVC, 2010) Underdrains are perforated pipes that collect subsurface water...", and the only contributor was "SamanthaPelayo" (talk))
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Overflow: Installation (content was: "Overflows are features of inline facilities and convey larger storm events out of the LID feature. '''Construction Steps:''' #Connect the overflow drain to the underdrain. #Fit a metal, domed grate to the overflow. #Install overflow pit to grade at the location specified in the contract documents. '''Key Inspection Points:''' *Overflow drain...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Paver installation (content was: "Permeable pavers have the highest load tolerance of the permeable pavement variations. It is especially important that the permeable pavers be installed correctly on the bedding material. See Permeable pavements: Specifications for more information. '''Construction Steps:''' #Lay permeable pavers by hand or install whole pallets of pavers at a time wi...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Impermeable liners: Installation (content was: " Impermeable liners can be applied when LID features are not intended to infiltrate runoff into the underlying soil. They protect building foundations or other subsurface infrastructure. They also prevent infiltration through contaminated soils. Where building foundations next to the LID feature are not waterproofed, liners can be used to protec...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Monitoring wells: Installation (content was: "400px|thumb|right|Monitoring well stack installed next to underdrain within the LID practice. (Photo Source: CVC, 2010) Monitoring wells allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Trench, chamber, and perforated pipe: Installation (content was: "The guidance provided in this section is applicable for the construction of soakaway pits, infiltration chambers, infiltration trenches, and exfiltration pipes of varying size and shape, since the installation of each of these features is similar. The [https://assets.ads-pipe.com/m/446afe5e1aafda1a/original/MC-7200-StormTech-Chamber-Installation-Guide.pdf...", and the only contributor was "SamanthaPelayo" (talk))
- 15:06, 22 November 2022 SamanthaPelayo talk contribs deleted page Permeable pavement sub-base and base course (content was: "Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. ===Sub-base reservoir=== In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, cr...", and the only contributor was "SamanthaPelayo" (talk))
- 15:06, 22 November 2022 SamanthaPelayo talk contribs deleted page Tamping (content was: "Tamping is an important construction step when installing permeable pavements systems. Tamping allows for the permeable surface (concrete or pavers) to set and adhere to the bedding layer beneath. Tamping also allows for flattening or evening out the surface, resulting in visually appealing finish. '''Construction Steps:''' #Remove any pieces that have im...", and the only contributor was "SamanthaPelayo" (talk))
- 15:05, 22 November 2022 SamanthaPelayo talk contribs deleted page Bioretention: Construction (content was: "==Construction Tasks Table== ==Construction Tasks Described== ==Key Construction Inspection Points== ==Inspection Point Timeline== ==Construction Mistakes to Avoid== <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-92.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-93.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-94.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-B...")
- 15:05, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: storage reservoir (content was: "The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space. '''Construction steps:''' #Backfill material from outside of the LID facility to avoid compaction and sediment entering...", and the only contributor was "SamanthaPelayo" (talk))
- 15:05, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: pretreatment and inlet (content was: "Pre-treatment structures are most cost effective when they slow down incoming flows, collect sediment for easy clean out, and slowly release water to the bioretention facility mitigating erosion. Pretreatment structures/strategies can include curb cuts, Aggregates, proprietary devices like filters or hydrodynamic separators, vegetation, concr...", and the only contributor was "SamanthaPelayo" (talk))
- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: plant material verification and installation (content was: "thumb|right|CVC staff planting plant material at Our Lady of Fatima Catholic School in Brampton, Ontario. (Photo Source: CVC, 2022) A healthy and vibrant vegetation structure provides itself with nutrients to sustain growth. Additionally, it holds, and retains water and oxygen, and binds and degrades pollutants. When select...", and the only contributor was "SamanthaPelayo" (talk))
- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: large stone and riprap (content was: "Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope. '''Construction Steps:''' #Backfill the material from the outside of the LID facility to avoid compaction. #Ensure the material is being placed to the elevation and thickn...", and the only contributor was "SamanthaPelayo" (talk))
- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: curbing (content was: "thumb|350px|right|Improper elevation at the curb cut, impeding the inflow to enter the LID facility (bioretention) (Photo source: CVC, 2015) It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors, and they...", and the only contributor was "SamanthaPelayo" (talk))
- 15:39, 21 November 2022 Dean Young talk contribs deleted page File:CIprocessFig63new.png
- 15:01, 21 November 2022 Dean Young talk contribs created page File:CIprocessFig63new.png (Recommended construction and assumption inspection process)
- 15:01, 21 November 2022 Dean Young talk contribs uploaded File:CIprocessFig63new.png (Recommended construction and assumption inspection process)
- 14:59, 21 November 2022 Dean Young talk contribs deleted page File:CI process Fig6.3 updated 20220830.png
- 14:49, 21 November 2022 Dean Young talk contribs created page File:CI process Fig6.3 updated 20220830.png (Recommended process for conducting construction and assumption inspections.)
- 14:49, 21 November 2022 Dean Young talk contribs uploaded File:CI process Fig6.3 updated 20220830.png (Recommended process for conducting construction and assumption inspections.)
- 20:58, 18 November 2022 DanielFilippi talk contribs created page File:OGS Review Sheet LOCKED UPDATE.xlsx
- 20:58, 18 November 2022 DanielFilippi talk contribs uploaded File:OGS Review Sheet LOCKED UPDATE.xlsx
- 22:51, 1 November 2022 174.114.241.27 talk submitted feedback post #0610d59... on Permeable pavements
- 15:36, 1 November 2022 DanielFilippi talk contribs restored page Placement and finishing (3 revisions)
- 15:35, 1 November 2022 DanielFilippi talk contribs deleted page Placement and finishing (content was: "375px|thumb|right|Vibratory screed flattening porous concrete. ([https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf CVC, 2012])<ref>CVC. 2012. Low Impact Development Construction Guide. Version 1.0. https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf</ref> File:Vibratory-s...", and the only contributor was "SamanthaPelayo" (talk))
- 14:28, 28 October 2022 192.186.125.158 talk submitted feedback post #06107bf... on Enhanced swales
- 14:41, 17 October 2022 DanielFilippi talk contribs created page Inspection and maintenance (Redirected page to Inspections and maintenance) Tag: New redirect
- 17:33, 14 October 2022 SamanthaPelayo talk contribs created page File:Double-ring-infiltrometer.png
- 17:33, 14 October 2022 SamanthaPelayo talk contribs uploaded File:Double-ring-infiltrometer.png
- 17:33, 14 October 2022 SamanthaPelayo talk contribs created page File:Flood-test-permeable-pavers.jpg
- 17:33, 14 October 2022 SamanthaPelayo talk contribs uploaded File:Flood-test-permeable-pavers.jpg
- 17:33, 14 October 2022 SamanthaPelayo talk contribs created page File:Flood-test-bioretention.jpg
- 17:33, 14 October 2022 SamanthaPelayo talk contribs uploaded File:Flood-test-bioretention.jpg
- 17:32, 14 October 2022 SamanthaPelayo talk contribs created page Final Certification (Created page with "Final inspection requirements are in-place to ensure that a final site-wide inspection is performed and that mitigation can occur before the contractor is relieved of responsi...")
- 17:28, 14 October 2022 SamanthaPelayo talk contribs created page Template:Construction: stabilizing contributing drainage area (Created page with " Similar to the plant material verification and installation task shown in Construction: plant material verification and installation page, any planting required to stabil...")
- 17:27, 14 October 2022 SamanthaPelayo talk contribs created page File:P1120709.jpg
- 17:27, 14 October 2022 SamanthaPelayo talk contribs uploaded File:P1120709.jpg
- 17:27, 14 October 2022 SamanthaPelayo talk contribs created page File:P1150948.jpg
- 17:27, 14 October 2022 SamanthaPelayo talk contribs uploaded File:P1150948.jpg
- 17:27, 14 October 2022 SamanthaPelayo talk contribs created page Joint aggregate (Created page with "The joint aggregate is an important component of Permeable Interlocking Concrete Pavement (PICP) installations, as it allows for water falling on the surface to infiltrate int...")
- 17:26, 14 October 2022 SamanthaPelayo talk contribs created page File:JointCutting2.jpg
- 17:26, 14 October 2022 SamanthaPelayo talk contribs uploaded File:JointCutting2.jpg
- 17:26, 14 October 2022 SamanthaPelayo talk contribs created page Joint cutting (Created page with "File:JointCutting2.jpg|400px|thumb|right| Cutting joints with a "pizza cutter". (Concrete Network, 2022)<ref> Concrete Network. 2022. Permeable Concrete Pavements. Photo. Ac...")
- 17:25, 14 October 2022 SamanthaPelayo talk contribs created page File:IMG 3313.jpg
- 17:25, 14 October 2022 SamanthaPelayo talk contribs uploaded File:IMG 3313.jpg
- 17:25, 14 October 2022 SamanthaPelayo talk contribs created page File:Tamping.jpg
- 17:25, 14 October 2022 SamanthaPelayo talk contribs uploaded File:Tamping.jpg
- 17:24, 14 October 2022 SamanthaPelayo talk contribs created page Tamping (Created page with "Tamping is an important construction step when installing permeable pavements systems. Tamping allows for the permeable surface (concrete or pavers) to set and adhere to the b...")