===Sampling===
===Sampling===
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
+
+
+
Result
+
{| class="wikitable"
+
! BMP Footprint (m²)
+
! test pit
+
! Bore hole
+
|-
+
| < 50 || 1 || 1
+
|-
+
| 50 – 900 || 1 || 2
+
|-
+
| || 2 || 0
+
|-
+
| > 900 || 1 every 450 m² || 2 every 450 m2
+
|-
+
| || 2 every 450 m² || 0
+
|-
+
| Linear || 1 every 450 m² || 1 every 50 m
+
|}
+
*For infiltration BMPs with footprint surface areas from 50 - 900 m<sup>2</sup>, a minimum of two test pits or one test pit and two soil borings are required at, or within 10 m of the proposed location to determine the suitability and distribution of soil types present;
*For infiltration BMPs with footprint surface areas from 50 - 900 m<sup>2</sup>, a minimum of two test pits or one test pit and two soil borings are required at, or within 10 m of the proposed location to determine the suitability and distribution of soil types present;