The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
   −
  −
Result
   
{| class="wikitable"
 
{| class="wikitable"
 
! BMP Footprint (m²)
 
! BMP Footprint (m²)
Line 73: Line 71:  
| < 50 || 1 || 1
 
| < 50 || 1 || 1
 
|-
 
|-
| 50 – 900 || 1 || 2
+
|rowspan = 2| 50 – 900 || 1 || 2
 
|-
 
|-
 
|  || 2 || 0
 
|  || 2 || 0
 
|-
 
|-
| > 900 || 1 every 450 m² || 2 every 450 m2
+
| rowspan = 2|> 900 || 1 every 450 m² || 2 every 450 m2
 
|-
 
|-
 
|  || 2 every 450 m² || 0
 
|  || 2 every 450 m² || 0