Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 19:55, 18 July 2023 DanielFilippi talk contribs deleted page File:OGS Review Sheet 2023-07-18.xlsx
- 13:18, 21 March 2023 Dean Young talk contribs deleted page File:Bioretention TSS.jpg
- 20:55, 13 February 2023 DanielFilippi talk contribs deleted page File:Hantush Macro update.xlsm
- 16:01, 21 December 2022 DanielFilippi talk contribs deleted page File:Design Table InfilTrench Partial Infil.PNG
- 15:55, 21 December 2022 DanielFilippi talk contribs deleted page File:Design Table PP No Infil.PNG (Deleted old revision 20221221155519!Design_Table_PP_No_Infil.PNG)
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Geotextiles: Installation (content was: "Geotextiles are filter fabrics that can be installed to separate dissimilar soils and prevent the migration of materials. Geotextiles are recommended for installation at the bottom and side limits of the LID feature and should be implemented at the discretion of the engineer. '''Construction Steps:''' #Roll out fabric on the flattened sub-grade surfac...", and the only contributor was "SamanthaPelayo" (talk))
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Underdrains: Installation (content was: "300px|thumb|right|Underdrain installed to subgrade. (Photo Source: CVC, 2010) 300px|thumb|right|Underdrain installed with maintenance risers. Note the 'T' joints, which are no longer recommended. (Photo Source: CVC, 2010) Underdrains are perforated pipes that collect subsurface water...", and the only contributor was "SamanthaPelayo" (talk))
- 15:09, 22 November 2022 SamanthaPelayo talk contribs deleted page Overflow: Installation (content was: "Overflows are features of inline facilities and convey larger storm events out of the LID feature. '''Construction Steps:''' #Connect the overflow drain to the underdrain. #Fit a metal, domed grate to the overflow. #Install overflow pit to grade at the location specified in the contract documents. '''Key Inspection Points:''' *Overflow drain...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Paver installation (content was: "Permeable pavers have the highest load tolerance of the permeable pavement variations. It is especially important that the permeable pavers be installed correctly on the bedding material. See Permeable pavements: Specifications for more information. '''Construction Steps:''' #Lay permeable pavers by hand or install whole pallets of pavers at a time wi...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Impermeable liners: Installation (content was: " Impermeable liners can be applied when LID features are not intended to infiltrate runoff into the underlying soil. They protect building foundations or other subsurface infrastructure. They also prevent infiltration through contaminated soils. Where building foundations next to the LID feature are not waterproofed, liners can be used to protec...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Monitoring wells: Installation (content was: "400px|thumb|right|Monitoring well stack installed next to underdrain within the LID practice. (Photo Source: CVC, 2010) Monitoring wells allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing...", and the only contributor was "SamanthaPelayo" (talk))
- 15:08, 22 November 2022 SamanthaPelayo talk contribs deleted page Trench, chamber, and perforated pipe: Installation (content was: "The guidance provided in this section is applicable for the construction of soakaway pits, infiltration chambers, infiltration trenches, and exfiltration pipes of varying size and shape, since the installation of each of these features is similar. The [https://assets.ads-pipe.com/m/446afe5e1aafda1a/original/MC-7200-StormTech-Chamber-Installation-Guide.pdf...", and the only contributor was "SamanthaPelayo" (talk))
- 15:06, 22 November 2022 SamanthaPelayo talk contribs deleted page Permeable pavement sub-base and base course (content was: "Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. ===Sub-base reservoir=== In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, cr...", and the only contributor was "SamanthaPelayo" (talk))
- 15:06, 22 November 2022 SamanthaPelayo talk contribs deleted page Tamping (content was: "Tamping is an important construction step when installing permeable pavements systems. Tamping allows for the permeable surface (concrete or pavers) to set and adhere to the bedding layer beneath. Tamping also allows for flattening or evening out the surface, resulting in visually appealing finish. '''Construction Steps:''' #Remove any pieces that have im...", and the only contributor was "SamanthaPelayo" (talk))
- 15:05, 22 November 2022 SamanthaPelayo talk contribs deleted page Bioretention: Construction (content was: "==Construction Tasks Table== ==Construction Tasks Described== ==Key Construction Inspection Points== ==Inspection Point Timeline== ==Construction Mistakes to Avoid== <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-92.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-93.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-94.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-B...")
- 15:05, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: storage reservoir (content was: "The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space. '''Construction steps:''' #Backfill material from outside of the LID facility to avoid compaction and sediment entering...", and the only contributor was "SamanthaPelayo" (talk))
- 15:05, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: pretreatment and inlet (content was: "Pre-treatment structures are most cost effective when they slow down incoming flows, collect sediment for easy clean out, and slowly release water to the bioretention facility mitigating erosion. Pretreatment structures/strategies can include curb cuts, Aggregates, proprietary devices like filters or hydrodynamic separators, vegetation, concr...", and the only contributor was "SamanthaPelayo" (talk))
- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: plant material verification and installation (content was: "thumb|right|CVC staff planting plant material at Our Lady of Fatima Catholic School in Brampton, Ontario. (Photo Source: CVC, 2022) A healthy and vibrant vegetation structure provides itself with nutrients to sustain growth. Additionally, it holds, and retains water and oxygen, and binds and degrades pollutants. When select...", and the only contributor was "SamanthaPelayo" (talk))
- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: large stone and riprap (content was: "Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope. '''Construction Steps:''' #Backfill the material from the outside of the LID facility to avoid compaction. #Ensure the material is being placed to the elevation and thickn...", and the only contributor was "SamanthaPelayo" (talk))
- 15:04, 22 November 2022 SamanthaPelayo talk contribs deleted page Construction: curbing (content was: "thumb|350px|right|Improper elevation at the curb cut, impeding the inflow to enter the LID facility (bioretention) (Photo source: CVC, 2015) It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors, and they...", and the only contributor was "SamanthaPelayo" (talk))
- 15:39, 21 November 2022 Dean Young talk contribs deleted page File:CIprocessFig63new.png
- 14:59, 21 November 2022 Dean Young talk contribs deleted page File:CI process Fig6.3 updated 20220830.png
- 15:36, 1 November 2022 DanielFilippi talk contribs restored page Placement and finishing (3 revisions)
- 15:35, 1 November 2022 DanielFilippi talk contribs deleted page Placement and finishing (content was: "375px|thumb|right|Vibratory screed flattening porous concrete. ([https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf CVC, 2012])<ref>CVC. 2012. Low Impact Development Construction Guide. Version 1.0. https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf</ref> File:Vibratory-s...", and the only contributor was "SamanthaPelayo" (talk))
- 15:36, 13 October 2022 DanielFilippi talk contribs deleted page File:OGS Review Sheet -LOCKED.xlsx (Deleted old revision 20221013153606!OGS_Review_Sheet_-LOCKED.xlsx)
- 14:30, 7 October 2022 DanielFilippi talk contribs deleted page Construction (content was: "{{float right|{{#widget:YouTube|id=8Hl4S-_G9-E}}}} {{TOClimit|2}} The following presents a summary of considerations when planning the construction of a low impact development project. More details can be found in the following reference:<ref>[https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf Construction Guide for Low Impact Development, CVC (2013)</ref> *The site of the infiltration facility must remain outside the limit of disturbance and blocked...")
- 20:21, 27 September 2022 DanielFilippi talk contribs deleted page LID construction (content before blanking was: "==Why is construction different?== ==Why problems occur?== ==Phases of LID Construction== '''1. Pre-Construction:''' *Verification of design *Tendering and contract *Pre-construction inspection and protocols *Mobilizing, access and perimeter controls *Erosion and Sediment Control (ESC) '''2. Construction:''' *Excavation and mass grading *Backfill granular and pipes *Finish grades: inlet, outlet, biomedia and plants '''3. Post-Construction:''' *Address defic...")
- 19:15, 17 May 2022 DanielFilippi talk contribs deleted redirect Salt by overwriting (Deleted to make way for move from "Salt management")
- 00:19, 31 March 2022 Dean Young talk contribs deleted page File:Google Earth 2017 Koppen Geiger Climate Zones of Canada 2.jpg (Duplicated file)
- 19:19, 3 March 2022 DanielFilippi talk contribs deleted page File:SWTT Struct Pan High Perm Final.png
- 15:08, 3 March 2022 DanielFilippi talk contribs deleted page File:Bioretention Full infiltration final placementswap.png
- 21:03, 2 March 2022 DanielFilippi talk contribs deleted page File:Bioretention No infiltration final.png
- 21:54, 25 February 2022 DanielFilippi talk contribs deleted page File:Stormwater Tree Trench high permeability native subsoil with soil cells.png
- 22:40, 24 February 2022 DanielFilippi talk contribs deleted page File:Update Stormwater Tree Trench Structural Panel Soil Cell.png (Duplicated file)
- 20:47, 7 December 2021 DanielFilippi talk contribs deleted page File:Infiltration chamber arrows.png
- 20:19, 6 December 2021 DanielFilippi talk contribs deleted page File:Dry pond-labelled.png
- 16:58, 2 December 2021 DanielFilippi talk contribs deleted page File:Tree trenches final.pdf (Deleted old revision 20211202165759!Tree_trenches_final.pdf: Duplicated file)
- 16:58, 30 July 2020 Dean Young talk contribs deleted page Perforated catchbasins (content before blanking was: "#REDIRECT Infiltration chambers")
- 19:11, 29 May 2020 Dean Young talk contribs deleted page File:Infiltration Sizing 20200525 locked.xlsx (Duplicated file)
- 20:15, 28 May 2020 Dean Young talk contribs deleted page File:Infiltation Sizing 20200525 locked.xlsx (Duplicated file)
- 20:07, 28 May 2020 Dean Young talk contribs deleted page File:Infiltation Sizing 20200525 locked.xlsm (Duplicated file)
- 15:13, 26 July 2019 Jenny Hill talk contribs deleted page Template:Widget (content was: "<noinclude> This is the 'Widget' template. It should be called in the following format: <pre> {{Widget |name= |description=...", and the only contributor was "Jenny Hill" (talk))
- 17:36, 3 July 2019 Jenny Hill talk contribs deleted page Widget:WolframAlpha (his widget doesn't work!!)
- 19:21, 26 June 2019 Jenny Hill talk contribs deleted page File:Darcy 3D.xlsx
- 18:42, 25 June 2019 Jenny Hill talk contribs deleted page File:Temp training file.xlsx (Duplicated file)
- 18:29, 15 March 2019 Jenny Hill talk contribs deleted page LID opportunities in residential and multi-residential types (content was: "#REDIRECT LID opportunities in industrial, commercial and multi-residential types")
- 18:24, 5 February 2019 Jenny Hill talk contribs deleted page File:World LA Month Logo.jpg
- 16:48, 7 December 2018 Jenny Hill talk contribs deleted page Bioretention: Construction (content was: "# Excavate subsurface water storage reservoir to base elevation, #Check base elevation and slope, #Fracture/rip bottom and...", and the only contributor was "Jenny Hill" (talk))
- 17:05, 27 November 2018 Jenny Hill talk contribs deleted page User:Sylvie.spraakman (content was: "Hi Sylvie, welcome to your very own page!", and the only contributor was "Jenny Hill" (talk))
- 23:35, 15 November 2018 Jenny Hill talk contribs deleted page What You Need To Do About Whiteboard Tape Beginning In The Next Four Minutes (Mass deletion of pages added by RubinCouch00)