User contributions
28 October 2022
Sub-surface components
no edit summary
+377
Sub-surface components
no edit summary
+6,448
Sub-surface components
Trench, Chamber, and Perforated Pipe Installation
+7,592
Sub-surface components
Permeable pavement sub-base and base course
+2,753
Sub-surface components
Storage reservoir
+1,598
Sub-surface components
Monitoring wells
+1,089
Sub-surface components
Overflows
+1,425
Sub-surface components
Impermeable liners
+1,939
Sub-surface components
Underdrains
+2,126
Sub-surface components
Geotextiles
+2,780
Pre-construction
Erosion and sediment control inspection and maintenance
Pre-construction
Erosion and sediment control inspection and maintenance
17 October 2022
14 October 2022
File:Double-ring-infiltrometer.png
no edit summary
File:Flood-test-permeable-pavers.jpg
no edit summary
File:Flood-test-bioretention.jpg
no edit summary
Final Certification
Created page with "Final inspection requirements are in-place to ensure that a final site-wide inspection is performed and that mitigation can occur before the contractor is relieved of responsi..."
Post-construction
Addressing deficiencies
+192
Finishing grades and surface layer installation: vegetated LIDs
Stabilizing contributing drainage area - planting adjacent vegetation
Template:Construction: stabilizing contributing drainage area
no edit summary
Template:Construction: stabilizing contributing drainage area
Created page with " Similar to the plant material verification and installation task shown in Construction: plant material verification and installation page, any planting required to stabil..."
Joint aggregate
no edit summary
File:P1120709.jpg
no edit summary
File:P1150948.jpg
no edit summary
Joint aggregate
Created page with "The joint aggregate is an important component of Permeable Interlocking Concrete Pavement (PICP) installations, as it allows for water falling on the surface to infiltrate int..."
File:JointCutting2.jpg
no edit summary
Joint cutting
Created page with "File:JointCutting2.jpg|400px|thumb|right| Cutting joints with a "pizza cutter". (Concrete Network, 2022)<ref> Concrete Network. 2022. Permeable Concrete Pavements. Photo. Ac..."
File:IMG 3313.jpg
no edit summary
File:Tamping.jpg
no edit summary
File:Paver-placement-vehicle.jpg
no edit summary
File:Paver-placement-vehicle-2.jpg
no edit summary
File:Paver-placement-crane.jpg
no edit summary
File:Paver-placement-cut.jpg
no edit summary
File:IMAX-Paved.jpg
no edit summary
File:Paver-cutting-incorrect.jpg
no edit summary
Placement and finishing
no edit summary
File:Concrete-roller.jpg
no edit summary
File:Vibratory-screed-2.jpg
no edit summary
File:Vibratory-screed.png
no edit summary
Placement and finishing
Created page with "File:Vibratory-screed.PNG|375px|thumb|right|Vibratory screed flattening porous concrete. ([https://cvc.ca/wp-content/uploads/2013/03/CVC-LID-Construction-Guide-Book.pdf CVC,..."
Bedding layer
no edit summary
File:Bedding-raking.jpg
no edit summary
Bedding layer
Created page with "450px|thumb|right|Bedding course being spread across the infiltration area. (Photo Source: CVC, 2012) The bedding layer consists of a coarse stone..."
File:P1000154.jpg
no edit summary
As-built surveys
Created page with "Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion o..."
File:Permanent-fencing.jpg
no edit summary
File:IMG 0852-1.jpg
no edit summary
Finishing grades and surface layer installation: vegetated LIDs
Mulch placement
-60
File:Spot8 p2 20190820.jpg
no edit summary