Line 256: Line 256:  
At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the project's staging plan, and potential failure points.
 
At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the project's staging plan, and potential failure points.
   −
[[File:ESC ponding 2.png|500px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]]
+
[[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]]
   −
[[File:ESC ponding 1.png|500px|thumb|center|This inlet control has worked well, but the sediment should be removed as soon as possible. (Photo source: CISEC)]]<br>
+
[[File:ESC ponding 1.png|525px|thumb|center|This inlet control has worked well, but the sediment should be removed as soon as possible. (Photo source: CISEC)]]<br>
    
==Mobilization, access, staging, and perimeter controls==
 
==Mobilization, access, staging, and perimeter controls==