==Monitoring wells==
==Monitoring wells==
+
[[File:monitoring-well-subgrade.jpg|400px|thumb|right|Monitoring well stack installed next to underdrain within the LID practice. (Photo Source: CVC, 2010)]]
+
[[Monitoring wells]] allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing as intended.
−
{{:Monitoring wells: Installation}}
+
'''Construction Steps:'''
+
#Install a cap stand at the required elevation to anchor the monitoring well.
+
#Wrap the perforated pipe with a geotextile sock (to prevent migration of soil into the well).
+
#Anchor the perforated pipe to the bottom of the LID feature.
+
#Install a lockable cap to the top of the standpipe to protect against vandalism.
+
#Install monitoring equipment (e.g., a level logger) if required.
+
+
'''Key Inspection Points:'''
+
*Pipe is perforated, rigid, and matches design specifications.
+
*Well is installed according to contract documents.
+
*Geotextile sock is wrapped around the perforated portion of the well.
+
+
'''Mistakes to Avoid:'''
+
*Incorrect sequencing: Ensure that standpipe is installed prior to backfilling with granular material.
==Storage reservoir==
==Storage reservoir==