User contributions
10 July 2020
Choker layer
no edit summary
+5
Bioretention
Plant Selection
Bioretention
Plant Selection
+2
Bioretention
Plant Selection
Bioretention
Plant Selection
-7
Bioretention
Plant Selection
+41
Bioretention
Plant Selection
-4
Freeboard
no edit summary
+29
Freeboard
no edit summary
+25
Overflow
Overflow Outlet Options
Overflow
Options
+16
Freeboard
no edit summary
-204
Overflow
Overflow elevation
-41
Overflow
Overflow elevation
+107
Overflow
Routing
+127
Overflow
Routing
-133
Bioretention
Design
+1
Bioretention
Private sites
+30
Bioretention
Space
+32
Bioretention
Overview
+1
Bioretention
Overview
+63
Bioretention
Overview
Bioretention
Overview
+67
3 June 2020
Groundwater
Groundwater mounding
-1
Drainage time
Calculating infiltration practice drainage time
+5
Bioretention: Sizing
Groundwater mounding
-6
Bioretention: Sizing
Groundwater mounding
-5
Bioretention: Sizing
Groundwater mounding
+10
Bioretention: Sizing
Calculate peak flow rates
-16
Bioretention: Sizing
Calculate peak flow rates
+24
2 June 2020
Infiltration: Sizing and modeling
Time to drain the storage reservoir
+3
Infiltration: Sizing and modeling
Time to drain the storage reservoir
Infiltration: Sizing and modeling
Time to drain the storage reservoir
+23
Infiltration: Sizing and modeling
Time required to drain surface ponded water (1D drainage)
+3
Infiltration: Sizing and modeling
Time required to drain surface ponded water (1D drainage)
+3
Infiltration: Sizing and modeling
To calculate the required storage reservoir depth, where the area is fixed or constrained (3D drainage)
+35
Infiltration: Sizing and modeling
To calculate the required storage reservoir depth, where the area is fixed or constrained (3D drainage)
+4
Infiltration: Sizing and modeling
To calculate the required storage reservoir depth where the area is fixed or constrained (1D drainage)
+4
Infiltration: Sizing and modeling
To calculate the required storage reservoir footprint area where the depth is fixed or constrained (1D drainage)
+2
Infiltration: Sizing and modeling
To calculate the required storage reservoir footprint area where the depth is fixed or constrained (1D drainage)
+29
Infiltration: Sizing and modeling
To calculate the required storage reservoir footprint area where the depth is fixed or constrained (1D drainage)
+1
Bioretention: Sizing
Determine the infiltration water storage depth of the practice
-1
Bioretention: Sizing
Determine the infiltration water storage depth of the practice
+1
Bioretention: Sizing
Determine the required surface area of the practice
-35
Bioretention: Sizing
no edit summary
+6
Bioretention: Sizing and modeling
Size a bioretention cell where drainage area and practice area are fixed
+4
Bioretention: Sizing and modeling
no edit summary
+74
Bioretention: Sizing
Calculate the total depth of the practice, dT
+10
Bioretention: Sizing
Calculate the total depth of the practice, dT
+110
Bioretention: Sizing and modeling
Size a bioretention cell receiving flows directly to the storage reservoir for a constrained depth
-32