*The overflow must be situated at the far end of the facility to prevent any localised ponding to cause bypassing of the infiltration facility.
*The overflow must be situated at the far end of the facility to prevent any localised ponding to cause bypassing of the infiltration facility.
−
*Offline facilities use flow splitters or bypass channels that only allow the required water quality storage volume to enter the facility.
+
*Offline facilities use flow splitters or bypass channels that only allow the design storm runoff storage volume to enter the facility.
−
:Higher flows are diverted and do not enter the infiltration practice. A pipe can by used for this, but a [[weir]] or [[curb cuts|curb cut]] minimizes clogging and reduces the maintenance frequency.
+
:Higher flows are conveyed to a downstream storm sewer or other BMP.
===Overflow elevation===
===Overflow elevation===