Changes

Jump to navigation Jump to search
m
Line 63: Line 63:  
===Sampling===
 
===Sampling===
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
 +
 +
 +
Result
 +
{| class="wikitable"
 +
! BMP Footprint (m²)
 +
! test pit
 +
! Bore hole
 +
|-
 +
| < 50 || 1 || 1
 +
|-
 +
| 50 – 900 || 1 || 2
 +
|-
 +
|  || 2 || 0
 +
|-
 +
| > 900 || 1 every 450 m² || 2 every 450 m2
 +
|-
 +
|  || 2 every 450 m² || 0
 +
|-
 +
| Linear  || 1 every 450 m² || 1 every 50 m
 +
|}
 +
    
*For infiltration BMPs with footprint surface areas from 50 - 900 m<sup>2</sup>, a minimum of two test pits or one test pit and two soil borings are required at, or within 10 m of the proposed location to determine the suitability and distribution of soil types present;
 
*For infiltration BMPs with footprint surface areas from 50 - 900 m<sup>2</sup>, a minimum of two test pits or one test pit and two soil borings are required at, or within 10 m of the proposed location to determine the suitability and distribution of soil types present;
8,255

edits

Navigation menu