Changes

Jump to navigation Jump to search
6 bytes added ,  6 years ago
m
no edit summary
Line 24: Line 24:  
* Slopes up to 10:1 or 20:1 are used when a shallow littoral shelf is desired to create vegetation and habitat diversity. The side slopes may be rip-rapped with stone to reduce the potential for erosion or rodent burrowing.
 
* Slopes up to 10:1 or 20:1 are used when a shallow littoral shelf is desired to create vegetation and habitat diversity. The side slopes may be rip-rapped with stone to reduce the potential for erosion or rodent burrowing.
 
<ref>CH2MHill. (2014). Wetland Design Guidelines City of Saskatoon. Retrieved from https://www.saskatoon.ca/sites/default/files/documents/transportation-utilities/construction-design/new-neighbourhood-design/wetlands_design_guidelines.pdf</ref>
 
<ref>CH2MHill. (2014). Wetland Design Guidelines City of Saskatoon. Retrieved from https://www.saskatoon.ca/sites/default/files/documents/transportation-utilities/construction-design/new-neighbourhood-design/wetlands_design_guidelines.pdf</ref>
 +
 +
----
8,255

edits

Navigation menu