The area required to keep the maximum head of water within the forebay to 0.15 m is calculated as:
 
The area required to keep the maximum head of water within the forebay to 0.15 m is calculated as:
 
:<math>A_{f}=\frac{0.816}{0.1}=8.16\ m^{2}</math>
 
:<math>A_{f}=\frac{0.816}{0.1}=8.16\ m^{2}</math>
and the area required to settle the 1 mm particles is calculated as:
+
The area required to settle the 1 mm particles is calculated as:
:<math>A_{f}=120\times 0.1 = 12\ m</math>
+
:<math>A_{f}=120\times 0.1 = 12\ m^{2}</math>
 +
So to meet the target particle removal, the forebay will be 12 m² in area. This gives the storage volume of 1.2 m³, which can be returned to the initial equation to determine the cleaning frequency as:
 +
:<math>C_{f}=\frac{1.2}{1.7\times 0.8\times 0.6}=\ almost\ 18\ months</math>
    