Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:  +
==Floodplain Mapping and Documentation Minimum Requirements==
 +
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
 +
# Existing and proposed floodplain delineation;
 +
# Topographic information including elevations and contours;
 +
# Conveyance structures including dams, bridges, culverts and weirs;
 +
# Man-made structures as applicable including buildings, roads, railways and trails;
 +
# Natural reservoirs or natural storage areas;
 +
# Spills analysis as applicable;
 +
# Cut/fill analysis in the regulated area as applicable;
 +
# Natural features such as watercourses and wetlands;
 +
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
 
==Survey Documentation Minimum Requirements==
 
==Survey Documentation Minimum Requirements==
 
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
 
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
8,255

edits

Navigation menu