#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention.
 
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention.
   −
==For porous pavement DIC systems:==
+
===For porous pavement DIC systems:===
 
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
 
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
 
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  
 
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  