==Design checklist==
 
==Design checklist==
#Verify the drainage area directed to any proposed porous pavement.  If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected.  It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing. [Section 4.2.1]
+
#Verify the drainage area directed to any proposed porous pavement.  If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected.  It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing.
#For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration. [Section 4.2.3, 2]
+
#For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration.
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention. [Section 4.2.3, 3]
+
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention.
   −
For porous pavement DIC systems:
+
==For porous pavement DIC systems:==
 
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
 
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
 
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  
 
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.  