Changes

Jump to navigation Jump to search
no edit summary
Line 11: Line 11:  
<math>L=\frac{360,000Q_{p}}{\left\{ b+2.388\left[\frac{Q_{p}n}{\left(2\sqrt{1+m^{2}-m}\right)S^{\frac{1}{2}}}\right ]^{\frac{3}{8}}\sqrt{1+m^{2}} \right \}q}</math>
 
<math>L=\frac{360,000Q_{p}}{\left\{ b+2.388\left[\frac{Q_{p}n}{\left(2\sqrt{1+m^{2}-m}\right)S^{\frac{1}{2}}}\right ]^{\frac{3}{8}}\sqrt{1+m^{2}} \right \}q}</math>
   −
{Plainlist|1=Where:
+
{{Plainlist|1=Where:
 
*L = length of swale in m
 
*L = length of swale in m
 
*Q<sub>p</sub> = peak flow of the storm to be controlled, in m<sup>3</sup>/s
 
*Q<sub>p</sub> = peak flow of the storm to be controlled, in m<sup>3</sup>/s
Line 17: Line 17:  
*S = the longitudinal slope (dimensionless)
 
*S = the longitudinal slope (dimensionless)
 
*n = Manning's coefficeint (dimensionless)
 
*n = Manning's coefficeint (dimensionless)
*b = bottom width of trapezoidal swale, in m.}
+
*b = bottom width of trapezoidal swale, in m.}}
     
8,255

edits

Navigation menu