Changes

Jump to navigation Jump to search
Line 33: Line 33:  
}}
 
}}
   −
===Planning===
+
==Planning==
 
NEW CONTENT HERE?
 
NEW CONTENT HERE?
    
<h4>Soil infiltration rate</h4>
 
<h4>Soil infiltration rate</h4>
 
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
 
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
 +
 +
{|class="wikitable"
 +
|+ Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities
 +
|-
 +
!style="background: darkcyan; color: white" rowspan = "2"|Catchment area
 +
!style="background: darkcyan; color: white" colspan="3"|Consequence of failure
 +
|-
 +
!No damage or inconvenience
 +
!Minor damage or inconvenience to external structures (e.g. ponding in parking lot)
 +
!Significant damage to buildings or infrastructure (e.g. flooding damage)
 +
|-
 +
|<100 m<sup>2</sup>||1.5||2||10
 +
|-
 +
|100 - 1000 m<sup>2</sup>||1.5||3||10
 +
 
<table class="table-responsive table table-striped">
 
<table class="table-responsive table table-striped">
 
         <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>
 
         <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>
8,255

edits

Navigation menu