Line 22:
Line 22:
#the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP.
#the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP.
===Designing with constraints===
===Designing with constraints===
−
{{TextBox|1= Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
+
{{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
*[[Bioretention: Internal water storage |Bioretention with internal water storage]]
*[[Bioretention: Internal water storage |Bioretention with internal water storage]]
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
}}
}}
−
{{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain stormwater:
+
{{textbox| Where infiltration is impossible, LID design alternatives exist which can still capture and retain stormwater:
*[[Bioretention: Non-infiltrating | Stormwater planters]]
*[[Bioretention: Non-infiltrating | Stormwater planters]]
*[[Rainwater harvesting]]
*[[Rainwater harvesting]]
*[[Green roofs]]
*[[Green roofs]]
}}
}}
−
----
+
===Planning===
===Planning===
NEW CONTENT HERE?
NEW CONTENT HERE?