Changes

Jump to navigation Jump to search
Line 36: Line 36:  
===Planning===
 
===Planning===
 
<h4>Soil infiltration rate</h4>
 
<h4>Soil infiltration rate</h4>
<p>[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design. </p>
+
[[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.  
<table>
+
<table class="table-responsive table table-striped">
    <table class="table-responsive table table-striped">
   
         <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>
 
         <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>
 
         <tr class="success">
 
         <tr class="success">
Line 60: Line 59:  
                     <td  class="text-center">10</td>
 
                     <td  class="text-center">10</td>
 
             </tr>
 
             </tr>
    </table>
+
</table>
 
<h4>Groundwater</h4>
 
<h4>Groundwater</h4>
<p> The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year. </p>
+
<p>The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year. </p>
    
{{:Feedback}}
 
{{:Feedback}}
 
[[category:Infiltration]]
 
[[category:Infiltration]]
8,255

edits

Navigation menu