Changes

Jump to navigation Jump to search
Line 392: Line 392:  
[[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]]
 
[[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]]
 
[[File:ESC ponding 1.png|525px|thumb|center|This inlet control has worked well, but the sediment should be removed as soon as possible. (Photo source: CISEC)]]
 
[[File:ESC ponding 1.png|525px|thumb|center|This inlet control has worked well, but the sediment should be removed as soon as possible. (Photo source: CISEC)]]
  −
Include copy of this section:
  −
https://wiki.sustainabletechnologies.ca/wiki/Pre-construction#Erosion_and_sediment_control_inspection_and_maintenance
      
=Performance Monitoring=
 
=Performance Monitoring=

Navigation menu