| | =Routine inspection= | | =Routine inspection= |
| − | ESC inspection programs regularly assess the effectiveness of BMPs, identify maintenance and repair needs, and identify areas where BMPs should be replaced or augmented. Consult the appendices linked in the first column of table 1, 2, and 3 (above) for BMP-specific inspection points. Inspections should be conducted: | + | ESC inspection programs regularly assess the effectiveness of BMPs, identify maintenance and repair needs, and identify areas where BMPs should be replaced or augmented. Consult the appendices linked in the first column of table 1 and 2 (above) for BMP-specific inspection points. |
| | + | |
| | + | Inspections should be conducted: |
| | *Before there is any activity to see the natural landscape, drainage, and sensitive features | | *Before there is any activity to see the natural landscape, drainage, and sensitive features |
| | *During the initial installation of ESC measures | | *During the initial installation of ESC measures |
| Line 387: |
Line 389: |
| | | | |
| | Where applicable, inspections of ESC measures should be integrated with inspections of LID features. Construction and assumption inspections (https://wiki.sustainabletechnologies.ca/wiki/Inspections_and_maintenance#Inspection_.26_Maintenance_Terminology) for LID features are often required on the same schedule as ESC measures - for example, weekly, after major storm events, or at key construction milestones. | | Where applicable, inspections of ESC measures should be integrated with inspections of LID features. Construction and assumption inspections (https://wiki.sustainabletechnologies.ca/wiki/Inspections_and_maintenance#Inspection_.26_Maintenance_Terminology) for LID features are often required on the same schedule as ESC measures - for example, weekly, after major storm events, or at key construction milestones. |
| | + | |
| | + | [[File:ESC ponding 2.png|575px|thumb|left|Ponding in front of this catchbasin indicates that this ESC inlet control is working. Ponding water allows for suspended sediments to settle. (Photo source: CISEC)]] |
| | + | [[File:ESC ponding 1.png|525px|thumb|center|This inlet control has worked well, but the sediment should be removed as soon as possible. (Photo source: CISEC)]] |
| | | | |
| | Include copy of this section: | | Include copy of this section: |