===Notes===
===Notes===
−
* Designs include [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]].
+
* Design includes [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]], and ditch inlet catch basin structure connected to downstream storm sewer pipe as outlet.
* Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation.
* Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation.