Changes

Jump to navigation Jump to search
Line 22: Line 22:     
===Notes===
 
===Notes===
* Designs include [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]].
+
* Design includes [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]], and ditch inlet catch basin structure connected to downstream storm sewer pipe as outlet.
 
* Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation.
 
* Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation.
  

Navigation menu