===Notes===
===Notes===
+
* Designs include [[pretreatment]] through stone diaphragms at [[Curb cuts|curb inlets]].
+
* Operation and maintenance cost estimates assume rehabilitation of the swale surface is required after 25 years of operation.
+
+
* The Tool assumes an in-line system.
* The Tool assumes an in-line system.
* The Tool assumed curb-and-gutter around the circumference of the facility with curb-cut inlets every 6 to 0.5 meter squared and stone splash pads.
* The Tool assumed curb-and-gutter around the circumference of the facility with curb-cut inlets every 6 to 0.5 meter squared and stone splash pads.