Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Infiltration Trench: Life Cycle Costs
(view source)
Revision as of 19:27, 22 December 2022
286 bytes added
,
1 year ago
→Design Assumptions
Line 15:
Line 15:
* Trench width of 2.0 metres.
* Trench width of 2.0 metres.
* Maximum impervious drainage area to permeable surface area (I:P area) ratio of 20:1.
* Maximum impervious drainage area to permeable surface area (I:P area) ratio of 20:1.
+
* Trench depth of 580 mm and surface area of 198.73 m2 (I:P area ratio of 10:1) on highly permeable native soil (Full Infiltration Design)
+
* Trench depth of 290 mm and surface area of 366.58 m2 (I:P area ratio of 5.5:1) on moderately permeable native soil (Partial Infiltration Design)
===Notes===
===Notes===
Dean Young
Bots
,
Bureaucrats
, developer,
Interface administrators
,
Suppressors
,
Administrators
,
Widget editors
2,683
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version