Changes

Jump to navigation Jump to search
Line 17: Line 17:     
===Notes===
 
===Notes===
* Designs include [[pretreatment]] through two (2) hydrodynamic separators ([[Oil and Grit Separator]]) located upstream of trench inlets, and two (2) 150 mm diameter monitoring wells per trench.
+
* Designs include [[pretreatment]] through two (2) hydrodynamic separators (i.e., [[Oil and Grit Separator| oil and grit separators]]) located upstream of trench inlets, and two (2) 150 mm diameter monitoring wells per trench.
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
* The tool calculates costs for new (greenfield) development contexts and includes costs for contractor overhead and profit, material, delivery, labour, equipment (rental, operating and operator costs), hauling and disposal.  
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.
 
** Land value and equipment mobilization and demobilization costs are not included, assuming BMP construction is part of overall development site construction.

Navigation menu