Changes

Jump to navigation Jump to search
no edit summary
Line 8: Line 8:  
#Repeat steps 4-5 until the joint gap has been filled completely.  
 
#Repeat steps 4-5 until the joint gap has been filled completely.  
   −
'''Note:''' Some paver joint widths may be narrow and not accept most of the ASTM No. 8 stone([https://www.angeluspavingstones.com/wp-content/uploads/2012/11/07_Aug_Contractor_Focus.pdf Interlocking Concrete Pavement Magazine, 2007])<ref> Interlocking Concrete Pavement Magazine. 2017. Contractor Focus: Construction of Bases for Permeable Interlocking Concrete Pavements - Part I. Edition August 2007. https://www.angeluspavingstones.com/wp-content/uploads/2012/11/07_Aug_Contractor_Focus.pdf</ref>. Instead, use material that will fill the joints such as washed ASTM No. 9( mm) or No. 10 (mm) stone.  
+
'''Note:''' Some paver joint widths may be narrow and not accept most of the ASTM No. 8 stone - ([https://www.angeluspavingstones.com/wp-content/uploads/2012/11/07_Aug_Contractor_Focus.pdf Interlocking Concrete Pavement Magazine, 2007])<ref> Interlocking Concrete Pavement Magazine. 2017. Contractor Focus: Construction of Bases for Permeable Interlocking Concrete Pavements - Part I. Edition August 2007. https://www.angeluspavingstones.com/wp-content/uploads/2012/11/07_Aug_Contractor_Focus.pdf</ref>. Instead, use material that will fill the joints such as washed ASTM No. 9( mm) or No. 10 (mm) stone.  
    
'''Key Inspection Points:'''
 
'''Key Inspection Points:'''

Navigation menu