**When the membrane is being used directly in the ground, punctures from stones can be prevented by compacting a layer sand (30  - 50 mm) over the soil prior to installing the membrane.  
 
**When the membrane is being used directly in the ground, punctures from stones can be prevented by compacting a layer sand (30  - 50 mm) over the soil prior to installing the membrane.  
 
**Similarly, a 50 mm sand layer should be applied on top of the membrane to protect it from the clear stone being used for drainage inside the BMP.   
 
**Similarly, a 50 mm sand layer should be applied on top of the membrane to protect it from the clear stone being used for drainage inside the BMP.   
 
+