Changes

Jump to navigation Jump to search
147 bytes removed ,  7 years ago
no edit summary
Line 2: Line 2:  
**When the membrane is being used directly in the ground, punctures from stones can be prevented by compacting a layer sand (30  - 50 mm) over the soil prior to installing the membrane.  
 
**When the membrane is being used directly in the ground, punctures from stones can be prevented by compacting a layer sand (30  - 50 mm) over the soil prior to installing the membrane.  
 
**Similarly, a 50 mm sand layer should be applied on top of the membrane to protect it from the clear stone being used for drainage inside the BMP.   
 
**Similarly, a 50 mm sand layer should be applied on top of the membrane to protect it from the clear stone being used for drainage inside the BMP.   
*Some designs include a concrete cell to prevent infiltration. The longevity of this type of construction may be improved with a coating of liquid waterproofing compound.
+
 
 +
[[Category:Materials]]
8,255

edits

Navigation menu