Line 89:
Line 89:
==Sizing==
==Sizing==
−
It is recommended that a standard sizing approach be used for all OGS units to ensure they are evaluated based on a consistent methodology. The attached OGS Review Calculator has been developed to facilitate application of ISO 14034 ETV test data through a standard approach applicable to all OGS MTD designs. The following methods and processes are built into the tool:
+
It is recommended that a standard sizing approach be used for all OGS units to ensure they are evaluated based on a consistent methodology. The attached OGS Review Calculator has been developed to facilitate application of ISO 14034 ETV test data through a standard approach applicable to all OGS MTD designs. The following methods and processes are built into the tool:<br>
−
* Rational Method used as a basis for flow calculations (Q = CiA, where C is the site runoff coefficient, i is the rainfall intensity and A is the drainage area) - Alternatively, provide bubble link to definition of rational method
+
'''Rational Method''' used as a basis for flow calculations:<br>
+
<math>Q = CiA</math>
+
**<math>C</math> is the site runoff coefficient,
+
**<math>i</math> is the rainfall intensity, and;
+
**<math>A</math> is the drainage area)
* Target treatment is based on capture and treatment of the average annual runoff volume for the site using ISO 14034 verified sediment removal test results for 7 surface loading rates
* Target treatment is based on capture and treatment of the average annual runoff volume for the site using ISO 14034 verified sediment removal test results for 7 surface loading rates
* Linear interpolation is used to calculate sediment removal efficiencies between the ISO/ETV tested surface loading rates
* Linear interpolation is used to calculate sediment removal efficiencies between the ISO/ETV tested surface loading rates