Changes

Jump to navigation Jump to search
Line 89: Line 89:     
==Sizing==
 
==Sizing==
It is recommended that a standard sizing approach be used for all OGS units to ensure they are evaluated based on a consistent methodology. The attached OGS Review Calculator has been developed to facilitate application of ISO 14034 ETV test data through a standard approach applicable to all OGS MTD designs.   The following methods and processes are built into the tool:
+
It is recommended that a standard sizing approach be used for all OGS units to ensure they are evaluated based on a consistent methodology. The attached OGS Review Calculator has been developed to facilitate application of ISO 14034 ETV test data through a standard approach applicable to all OGS MTD designs. The following methods and processes are built into the tool:<br>
* Rational Method used as a basis for flow calculations (Q = CiA, where C is the site runoff coefficient, i is the rainfall intensity and A is the drainage area) - Alternatively, provide bubble link to definition of rational method
+
'''Rational Method''' used as a basis for flow calculations:<br>
 +
<math>Q = CiA</math>
 +
**<math>C</math> is the site runoff coefficient,  
 +
**<math>i</math> is the rainfall intensity, and;
 +
**<math>A</math> is the drainage area)
 
* Target treatment is based on capture and treatment of the average annual runoff volume for the site using ISO 14034 verified sediment removal test results for 7 surface loading rates
 
* Target treatment is based on capture and treatment of the average annual runoff volume for the site using ISO 14034 verified sediment removal test results for 7 surface loading rates
 
* Linear interpolation is used to calculate sediment removal efficiencies between the ISO/ETV tested surface loading rates
 
* Linear interpolation is used to calculate sediment removal efficiencies between the ISO/ETV tested surface loading rates

Navigation menu