Line 25:
Line 25:
#where prohibitions and/or restrictions exist per approved Drinking Water Source Protection Plans (e.g. should not be used to treat pavement runoff within 2 year time of travel wellhead protection areas; see MOECC guidance).
#where prohibitions and/or restrictions exist per approved Drinking Water Source Protection Plans (e.g. should not be used to treat pavement runoff within 2 year time of travel wellhead protection areas; see MOECC guidance).
<br>
<br>
+
+
===Designing within constraints===
+
{{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
+
*See [[Underdrains| underdrains]] for [[Bioretention| bioretention]] and [[Trees| tree pits, trenches and soil cells]], and
+
*Results from STEP studies of infiltration practices on [[low permeability soils]]
Infiltration facilities should be designed with modifications where:
Infiltration facilities should be designed with modifications where:
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
#the seasonal high groundwater level (i.e. water table) comes within 1 m below the bottom of the proposed BMP.
#the seasonal high groundwater level (i.e. water table) comes within 1 m below the bottom of the proposed BMP.
−
===Designing with constraints===
−
{{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
−
*See [[Underdrains| underdrains]] for [[Bioretention| bioretention]] and [[Trees| tree pits, trenches and soil cells]], and
−
*Results from STEP studies of infiltration practices on [[low permeability soils]]
−
}}
−
−
{{textbox|Where infiltration is impossible, LID design alternatives exist which can still capture and retain stormwater:
−
*[[Stormwater planters]]
−
*[[Rainwater harvesting]]
−
*[[Green roofs]]
−
*[[Blue roofs]]
}}
}}
+
{{:Groundwater}}
==Planning==
==Planning==