Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1: −
The following calculation is used to size the stone storage bed (reservoir) used as a base course. It is assumed that the footprint of the stone bed will be equal to the footprint of the pavement. The following equations are derived from the ICPI Manual <ref>Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design, Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute. Burlington, ON.</ref>
+
The following calculation is used to size the stone storage bed (reservoir) used as a base course. It is assumed that the footprint of the stone bed will be equal to the footprint of the pavement. The following equations are derived from the Interlocking Concrete Pavement Institute (ICPI) manual <ref>Smith, D. 2017. Permeable Interlocking Concrete Pavements; Selection, Design, Specifications, Construction, Maintenance. 5th Edition. Interlocking Concrete Pavement Institute. Chantilly VA</ref>
    
===For full infiltration design, to calculate the total depth of clear stone aggregate layers needed for the water storage reservoir===  
 
===For full infiltration design, to calculate the total depth of clear stone aggregate layers needed for the water storage reservoir===  

Navigation menu