Changes

Jump to navigation Jump to search
no edit summary
Line 39: Line 39:  
Where:<br>
 
Where:<br>
   −
A<sub>c</sub> = A<sub>i</sub> + A<sub>p</sub>
+
A<sub>c</sub> = A<sub>i</sub> + A<sub>p</sub>, and
 +
A<sub>r</sub> = A<sub>p</sub> (i.e., assumed that the water storage reservoir area and permeable pavement area are the same)
 
<br>
 
<br>
 
<br>
 
<br>
Then increase A<sub>r</sub> accordingly to keep R between 0 and 2, which reduces hydraulic loading and helps avoid premature clogging. This assumes that the water storage reservoir area and permeable pavement area are the same (A<sub>r</sub> = A<sub>p</sub>). 
+
Then increase A<sub>r</sub> accordingly to keep R between 0 and 2, which reduces hydraulic loading and helps avoid premature clogging.
 
      
Back to [[Permeable pavements]]
 
Back to [[Permeable pavements]]
 
[[Category:Calculations]]
 
[[Category:Calculations]]

Navigation menu