Changes

Jump to navigation Jump to search
no edit summary
Line 15: Line 15:  
*To calculate the required footprint area of an infiltration facility with a known depth constraint....
 
*To calculate the required footprint area of an infiltration facility with a known depth constraint....
 
*To calculate the infiltration time of ponded water on the surface of a facility footprint...
 
*To calculate the infiltration time of ponded water on the surface of a facility footprint...
*To calculate the drawdown time of an underground infiltration facility...|}}}}  
+
*To calculate the drainage time of an underground infiltration facility...|}}}}  
    
The sizing calculations require that most of the following parameters be known or estimated.  
 
The sizing calculations require that most of the following parameters be known or estimated.  

Navigation menu