Line 5: |
Line 5: |
| | | |
| ==Design checklist== | | ==Design checklist== |
− | #Verify the drainage area directed to any proposed porous pavement. If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected. It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing. [Section 4.2.1] | + | #Verify the drainage area directed to any proposed porous pavement. If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected. It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing. |
− | #For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration. [Section 4.2.3, 2] | + | #For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration. |
− | #For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention. [Section 4.2.3, 3] | + | #For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention. |
| | | |
− | For porous pavement DIC systems: | + | ==For porous pavement DIC systems:== |
| #Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge. | | #Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge. |
| #Verify that the surface slope in any direction across porous pavement does not exceed 5%. | | #Verify that the surface slope in any direction across porous pavement does not exceed 5%. |