Bioretention: Partial infiltration

From LID SWM Planning and Design Guide
Revision as of 15:41, 7 March 2022 by DanielFilippi (talk | contribs)
Jump to navigation Jump to search
Underdrain Access StructureUnderdrain Access StructureUnderdrainWater Level SensorInternal Water StorageMonitoring WellMonitoring WellInternal Water StorageOverflow OutletOverflow OutletOverflow Outlet PipeMulchMulchMulchMulchMulchMulchErosion Control - StoneErosion Control - StoneCurb CutCurb CutTreeVegetationVegetationTreeVegetationPonding DepthMulchMulchFilter MediaFilter MediaFilter MediaChoker LayerChoker LayerChoker LayerClear Stone / AggregateClear Stone / AggregateClear Stone / AggregateCompacted Subgrade SoilCompacted Subgrade Soil
Partial infiltration bioretention cell draining a parking lot. This design variation includes an underdrain and surface overflow pipes that allow excess water to leave the practice. A monitoring well is included so drainage performance can be evaluated over its operating lifespan. For more details on this variation of a bioretention feature and others, click here for the City of Toronto's Green Streets Technical Guidelines (GSTG).,[1] Note: The following is an "image map", feel free to explore the image with your cursor and click on highlighted labels that appear to take you to corresponding pages on the Wiki.

Overview[edit]

Over soils with slow infiltration rates, it is advantageous to drain a portion of the stored water prior to any upcoming storm. This popular design choice can optimize annual water balance, mitigate peak flow rates and by ensuring water flow through, can reduce the accumulation of sodium and chlorine ions from winter salting.

Partial infiltration.png

Partially infiltrating bioretention with underdrain.

Partial with storage.png

Partially infiltrating bioretention with anaerobic/aerobic storage zone.

Materials[edit]

Research[edit]

Bioretention: Partial infiltration volume

Back to Bioretention

  1. City of Toronto. 2017. City of Toronto's Green Streets Technical Guidelines - Version 1.0. Schollen & Company Inc., Urban Forest Innovators, TMIG, DMG. August, 2017. https://www.toronto.ca/legdocs/mmis/2017/pw/bgrd/backgroundfile-107514.pdf