[[File:Sizing flow-through planter.jpg|thumb|A flow-through planter comprises a ponding zone, mulch layer, filter media for planting, and a supporting gravel drainage layer]] | [[File:Sizing flow-through planter.jpg|thumb|A flow-through planter comprises a ponding zone, mulch layer, filter media for planting, and a supporting gravel drainage layer]] | ||
− | This article is specific to [[ | + | This article is specific to [[Flow-through stormwater planters]], vegetated systems that do not infiltrate water to the native soil. <br> |
− | If you are designing a planted system which does | + | If you are designing a planted system which does infiltrate water, see advice on [[Bioretention: Sizing]]. |
− | |||
{{TOClimit|2}} | {{TOClimit|2}} | ||
− | + | The dimensions of a stormwater planter are largely predetermined according to the function of the component. As they do not contain a storage reservoir the planters rely more upon careful selection of materials. Both the filter media and the perforations of the pipe play critical roles for flow control. | |
{| class="wikitable" | {| class="wikitable" | ||
Line 10: | Line 9: | ||
! Component | ! Component | ||
! Recommended depth (with underdrain pipe) | ! Recommended depth (with underdrain pipe) | ||
− | |||
! Typical void ratio (''V<sub>R</sub>'') | ! Typical void ratio (''V<sub>R</sub>'') | ||
|- | |- | ||
| Ponding (''d<sub>p</sub>'') | | Ponding (''d<sub>p</sub>'') | ||
− | | 300 mm | + | | ≥ 300 mm |
− | |||
| 1 | | 1 | ||
|- | |- | ||
| [[Mulch]] | | [[Mulch]] | ||
− | + | | 75 ± 25 mm | |
| | | | ||
* 0.7 for wood based | * 0.7 for wood based | ||
Line 25: | Line 22: | ||
|- | |- | ||
| [[Bioretention: Filter media|filter media]] (''d<sub>m</sub>'') | | [[Bioretention: Filter media|filter media]] (''d<sub>m</sub>'') | ||
− | + | | | |
* 300 mm to support turf grass (and accept only rainwater/roof runoff) | * 300 mm to support turf grass (and accept only rainwater/roof runoff) | ||
* 600 mm to support flowering [[perennials]] and decorative [[grasses]] | * 600 mm to support flowering [[perennials]] and decorative [[grasses]] | ||
Line 31: | Line 28: | ||
| 0.3 | | 0.3 | ||
|- | |- | ||
− | + | ||
− | |||
− | |||
− | |||
| Pipe diameter reservoir | | Pipe diameter reservoir | ||
| Is equal to underdrain pipe diameter | | Is equal to underdrain pipe diameter | ||
− | |||
| 0.4 | | 0.4 | ||
|- | |- | ||
− | | | + | | Pipe bedding (''d<sub>b</sub>'') |
− | | | + | | 50 mm (although commonly omitted altogether). |
− | |||
| 0.4 | | 0.4 | ||
|} | |} |
Revision as of 17:44, 19 March 2018
This article is specific to Flow-through stormwater planters, vegetated systems that do not infiltrate water to the native soil.
If you are designing a planted system which does infiltrate water, see advice on Bioretention: Sizing.
The dimensions of a stormwater planter are largely predetermined according to the function of the component. As they do not contain a storage reservoir the planters rely more upon careful selection of materials. Both the filter media and the perforations of the pipe play critical roles for flow control.
Component | Recommended depth (with underdrain pipe) | Typical void ratio (VR) |
---|---|---|
Ponding (dp) | ≥ 300 mm | 1 |
Mulch | 75 ± 25 mm |
|
filter media (dm) |
|
0.3 |
Pipe diameter reservoir | Is equal to underdrain pipe diameter | 0.4 |
Pipe bedding (db) | 50 mm (although commonly omitted altogether). | 0.4 |
Calculate the maximum overall depth[edit]
- Step 1: Determine what the planting needs are and assign appropriate depth of media, using the table above.
- Step 2: Select an underdrain pipe diameter (typically 100 - 200 mm), assign this as an 'embedding' depth.
- Step 3: Calculate the maximum possible storage reservoir depth beneath the pipe (ds):
Where:
- f' = Design infiltration rate in mm/hr, and
- 38.4 comes from multiplying desired drainage time of 96 hours by void ratio of 0.4
Additional step for system without underdrain[edit]
- Step 4: Determine maximum permissible ponding depth (dp):
Where:
- f' = Design infiltration rate in mm/hr, and
- 19.2 comes from multiplying desired drainage time of 48 hours by void ratio of 0.4. Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.
- Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
Calculate the remaining dimensions[edit]
- Step 6: Multiply the depth of each separate component by the void ratio and then sum the total to find the 1 dimensional storage (in mm).
- Step 7: Calculate the required total storage (m3):
Where:
- RVCT is the Runoff volume control target (mm),
- Ac is the catchment area (Ha),
- C is the runoff coefficient of the catchment area, and
- 0.1 is the units correction between m3 and mm.Ha.
- Step 8. Divide required storage (m3) by the 1 dimensional storage (in m) to find the required footprint area (Ap) for the bioretention in m2.
- Step 9. Calculate the peak flow rate (Qp, in L/s) through the filter media: