==Design checklist==
==Design checklist==
−
#Verify the drainage area directed to any proposed porous pavement. If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected. It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing. [Section 4.2.1]
+
#Verify the drainage area directed to any proposed porous pavement. If DCIA runoff from other areas on-site, in addition to the direct (1:1) rainfall onto the porous pavement, is directed onto porous pavement, the porous pavement cannot be considered disconnected. It must instead be considered, and modeled as, a porous pavement structural SMP. The porous surface must be considered, and modeled as, DCIA. Porous pavement structural SMPs require infiltration testing.
−
#For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration. [Section 4.2.3, 2]
+
#For porous pavement structural SMPs, if infiltration is feasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.10, Subsurface Infiltration.
−
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention. [Section 4.2.3, 3]
+
#For porous pavement structural SMPs, if infiltration is infeasible, verify that the porous pavement design meets all Design Guidance Checklist design standards noted in Appendix F.14, Subsurface Detention.
−
For porous pavement DIC systems:
+
==For porous pavement DIC systems:==
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
#Verify that the porous pavement DIC is installed on-site such that it does not create any areas of concentrated infiltration or discharge.
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.
#Verify that the surface slope in any direction across porous pavement does not exceed 5%.