Changes

Jump to navigation Jump to search
Line 22: Line 22:  
#the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP.
 
#the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP.
 
===Designing with constraints===
 
===Designing with constraints===
{{TextBox|1= Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
+
{{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
 
*[[Bioretention: Internal water storage |Bioretention with internal water storage]]
 
*[[Bioretention: Internal water storage |Bioretention with internal water storage]]
 
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
 
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
 
}}
 
}}
   −
{{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
+
{{textbox| Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
 
*[[Bioretention: Non-infiltrating | Stormwater planters]]
 
*[[Bioretention: Non-infiltrating | Stormwater planters]]
 
*[[Rainwater harvesting]]
 
*[[Rainwater harvesting]]
 
*[[Green roofs]]
 
*[[Green roofs]]
 
}}
 
}}
----
+
 
 
===Planning===
 
===Planning===
 
NEW CONTENT HERE?
 
NEW CONTENT HERE?
8,255

edits

Navigation menu