Difference between revisions of "Dry ponds"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 39: Line 39:
 
===Infiltration===
 
===Infiltration===
 
For information about constraints to infiltration practices, and approaches and tools for identifying and designing within them see [[Infiltration]]. For guidance on infiltration testing and selecting a design infiltration rate see [[Design infiltration rate]].
 
For information about constraints to infiltration practices, and approaches and tools for identifying and designing within them see [[Infiltration]]. For guidance on infiltration testing and selecting a design infiltration rate see [[Design infiltration rate]].
[[File:Drypondsign.png|200px|thumb|Signs should be erected around the dry pond at locations highly visible to the public to identify the site as a stormwater management facility and raise awareness of the function and hazards (City of Toronto, 2015)<ref name = "CoT 2015">City of Toronto. 2015. Landscape Design Guidelines for Stormwater Management Ponds. https://www.toronto.ca/wp-content/uploads/2017/11/913f-ecs-specs-landscape-Landscape_Design_Guidelines_SWM_Ponds_Sep2015.pdf</ref>.]]
+
 
 +
[[File:Drypondsign.png|200px|thumb|Dry pond public safety sign (City of Toronto, 2015)<ref name = "CoT 2015">City of Toronto. 2015. Landscape Design Guidelines for Stormwater Management Ponds. https://www.toronto.ca/wp-content/uploads/2017/11/913f-ecs-specs-landscape-Landscape_Design_Guidelines_SWM_Ponds_Sep2015.pdf</ref>.]]
  
 
===Public safety===
 
===Public safety===
Where temporary storage of water occurs on the surface, the depth and rate of rise of the water should be sufficiently low that risks are minimized for site users, especially since the temporary nature of the storage facility will mean that the public are not accustomed to its presence. A risk assessment should be undertaken of the frequency and rate of flooding to a range of inundation depths in order that public safety is not jeopardised (Ballard et al., 2015). <ref name=Ballard>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. 2015. The SuDS Manual. London.https://www.scotsnet.org.uk/__data/assets/pdf_file/0023/51764/CIRIA-report-C753-the-SuDS-manual-v6.pdf</ref>
+
Where temporary storage of water occurs on the surface, the depth and rate of rise of the water should be sufficiently low that risks are minimized for site users, especially since the temporary nature of the storage facility will mean that the public are not accustomed to its presence. A risk assessment should be undertaken of the frequency and rate of flooding to a range of inundation depths in order that public safety is not jeopardised (Ballard et al., 2015)<ref name=Ballard>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. 2015. The SuDS Manual. London.https://www.scotsnet.org.uk/__data/assets/pdf_file/0023/51764/CIRIA-report-C753-the-SuDS-manual-v6.pdf</ref>. Signs should be erected around the dry pond at locations highly visible to the public to identify the site as a stormwater management facility and raise awareness of the function and hazards (City of Toronto, 2015)<ref name = "CoT 2015"></ref>.
  
 
===Water temperature===
 
===Water temperature===

Revision as of 15:30, 20 August 2025

Sediment ForebaysInletInletStone Erosion ControlStone Erosion ControlForebay BermsBermsVegetationOutletOutletOutlet Pipe
The following image showcases an extended detention dry pond. For more details click here.[1].A note: The following is an "image map", feel free to explore the image with your cursor and click on highlighted labels that appear to take you to corresponding pages on the Wiki.
Click here to see map of Dry Ponds in Scarborough and surroundings

See also Water squares


Overview[edit]

A dry pond is a detention basin designed to temporarily store collected stormwater runoff and release it at a controlled rate through an outlet (MOE, 2003). Also known as infiltration basins or detention basins (according to their features), dry ponds are a grassed alternative to bioretention cells. Dry ponds may have a deep pool of water in the sediment forebay to reduce scour and resuspension of sediment, but do not have a permanent pool of water in the main basin. This permits the dry pond to be integrated into the landscape to be accessed and used as an amenity space. Dry ponds are recommended as flood control structures to accommodate occasional excess overflow downstream of other structural BMPs. Compared to wet ponds, dry ponds are less expensive to install, require less maintenance, and may involve less liability for the community (Fairfax County, 2025)[2].

Dry ponds are ideal for:

  • Managing infrequent extreme flow events,
  • erosion management,
  • incorporating into parks and other green recreational spaces, and
  • distributing across a larger development site.



Planning considerations[edit]

Multiuse soccer field and intermittent detention pond in Montana during a dry period (top) and after rainfall (bottom) (TD & H Engineering, 2025)[3].

Location[edit]

Dry ponds are a useful tool for managing flooding during larger storm events. They are well suited to being placed downstream of other smaller distributed BMPs as an end-of-pipe control for occasional backup flood protection. Where possible, they should be integrated into amenity space, given that users rarely wish to continue outdoor activities during such intense rainstorms.

Infiltration[edit]

For information about constraints to infiltration practices, and approaches and tools for identifying and designing within them see Infiltration. For guidance on infiltration testing and selecting a design infiltration rate see Design infiltration rate.

Dry pond public safety sign (City of Toronto, 2015)[4].

Public safety[edit]

Where temporary storage of water occurs on the surface, the depth and rate of rise of the water should be sufficiently low that risks are minimized for site users, especially since the temporary nature of the storage facility will mean that the public are not accustomed to its presence. A risk assessment should be undertaken of the frequency and rate of flooding to a range of inundation depths in order that public safety is not jeopardised (Ballard et al., 2015)[5]. Signs should be erected around the dry pond at locations highly visible to the public to identify the site as a stormwater management facility and raise awareness of the function and hazards (City of Toronto, 2015)[4].

Water temperature[edit]

Dry detention ponds can elevate the temperature of stormwater. This effect can be reduced by shortening detention time (US EPA, 2021)[6], increasing canopy cover (LSRCA, 2022)[7], or installing a cooling trench at the pond outlet (City of Toronto, 2015)[4]. Alternative stormwater controls may be better suited for areas that discharge to cold-water streams.

Design[edit]

Design parameters for extended detention (MOE, 2003)[1]
Element Design Objective Criteria
Drainage Area Minimum orifice size (see flow control)
  • 5 Ha
  • ≥10 Ha preferred
Treatment Volume Provision of appropriate level of protection
Active Storage Detention
Forebay Pre-treatment
  • Minimum depth: 1 m;
  • Sized to ensure non-erosive velocities leaving forebay;
Length-to-Width Ratio Maximize flow path and minimize short-circuiting potential
  • Overall: minimum 3:1
  • 4:1 preferred
Depth Safety
  • Maximum 3 m
  • Flat bottom to encourage uniform ponding/infiltration (recommended tolerance on base levels 10 mm in 3m)
Side slopes (See also berms) Safety
  • 4:1 average
  • no steeper than 1:3 to permit vegetation stabilization and maintenance/amenity access (except where pond <0.5 m deep)
  • stepped or benched slopes possible depending on maintenance access (Ballard et al., 2015)[5]
Inlet Avoid clogging/freezing
  • Minimum 450 mm diameter inlet pipe;
  • Preferred pipe slope: > 1 %;
  • If submerged, obvert 150 mm below expected maximum ice depth
Outlet (See also flow control) Avoid clogging/freezing
  • Minimum: 450 mm diameter outlet pipe;
  • Preferred pipe slope: > 1 %;
  • If orifice control used, 75 mm diameter minimum;
  • Minimum 100 mm orifice preferable
Maintenance access Access for backhoes or dredging equipment
  • Provided to approval of Municipality;
  • Provision of maintenance drawdown pipe preferred
Buffer Safety
  • Minimum 3 m above maximum water quality/erosion control water level

Volume[edit]

Recommended storage volumes per ha by catchment imperviousness for continuous flow dry ponds with basic protection (MOE, 2003)[1]
Imperviousness of Catchment Storage Volume (m³/ha)
35% 90
55% 150
70% 200
85% 240

The surface storage volume of a dry pond (Ap) is determined:

Where:

Higher catchment imperviousness may require a larger storage volume, as shown in the chart on the right.

Detention time[edit]

A minimum detention time of 24 hours should be targeted in all instances, but 48 hours is preferred for water quality benefits. Where this necessitates a very low outflow, a vortex valve or similar is recommended over an orifice or pipe restriction. The detention time is approximated by the drawdown time. The drawdown time in the pond can be estimated using the classic falling head orifice equation which assumes a constant pond surface area[1]. This assumption is generally not valid, and a more accurate estimation can be made if the equation is solved as a differential equation. This is easily done if the relationship between pond surface area and pond depth is approximated using a linear regression:

Where

  • t = Drawdown time (s)
  • Ap = Surface area of the pond(m2)
  • C = Discharge coefficient (typically 0.63)
  • Ao = Cross-sectional area of the orifice(m2)
  • g = Gravitational acceleration constant (9.81 m/s2)
  • h1 = Starting water elevation above the orifice (m)
  • h2 = Ending water elevation above the orifice (m)

C2 slope coefficient from the area-depth linear regression C3 intercept from the area-depth linear regression

Settling Velocity of Particulates[edit]

The process of sedimentation is enacted when solids "settle" to the bottom of a sedimentation practice, from suspension in moving or retained water (in this case a dry pond BMP). Due to dry ponds having grassy channels and slopes they are able to over time decrease the velocity of incoming stormwater flow that enters the practice. This combined with the agility of the practice to allow for temporary storage and ponding of water (24 - 48 hr) allows excess sediments (sand, silts, clay and small aggregates) and associated pollutants to settle and be retained within the BMP (Weiss et al. 2010)[8]. These sediments should be removed periodically to maintain as designed performance of the feature. The following calculations are for measuring the settling velocities of various solids.

Stoke's Law for settling solids[edit]

Stoke's Law measures solids settling in stormwater features and is applicable to fines, clay, silt, and sand in water.


Where

  • V = settling velocity of particles (m/s)
  • g = gravitational acceleration constant (9.81 m/s2)
  • d = diameter of the solid (spherical) (m)
  • ρ1 = mass density of solid (kg/m3)
  • ρ: mass density of water (1000 kg/m3
  • v: kinematic viscosity of water at (1 mm2/s)


Ferguson & Church (2004)[9][edit]

Ferguson & Church's calculation meanwhile allows for designers to include the relationship between settling velocity and particle diameter size. A relationship for settling velocity that incorporates larger particles, such as sands with Reynolds Number (RE) > 10. The equation becomes Stokes' Law when particles have smaller diameters and allows for a constant drag coefficient to be applied for larger particle diameters.


Where

  • V = settling velocity of particles (m/s)
  • g = gravitational acceleration constant (9.81 m/s2)
  • d = diameter of the solid (spherical) (µm)
  • v = kinematic viscosity of water (1 mm2/s)
  • R = Specific gravity for solid in question (i.e. 1.58kg/cm3 for sand)
  • C = Typical constant for spherical solids (0.4) and (1.0) for sand grains

See the table below for average settling velocities of different particle size ranges and particle types based on MOEE (1994)[10] and from Muschalla, 2014[11]

Visual Indicators Framework - Bioretention/Swales

Size Fraction (i)

Particle size range (µm)

Average settling velocity of particles in size fraction i, Vsi (m/s)

Fraction of total mass contained in size fraction i (%) - MOEE

Fraction of total mass contained in size fraction i (%) - measured
1 x ≤ 20 2.54E-06 20 83.4
2 20 ≤ x ≤ 40 1.30E-05 10 9.1
3 40 ≤ x ≤ 60 2.54E-05 10 4.4
4 60 ≤ x ≤ 130 1.27E-04 20 4.1
5 130 ≤ x ≤ 400 5.93E-04 20 -
6 400 ≤ x ≤ 4000 5.50E-03 20 -


Excess flow control[edit]

See Flow through riser

Modeling[edit]

Dry ponds are found in storage element in the LID TTT
The largest area is at the top, level 0 m; each subsequent lower depth has a smaller area

The Low Impact Development Treatment Train Tool can analyze annual and event-based runoff volumes and pollutant load removal for dry ponds.

TTT.png

A dry pond as a storage element (key parameters) in the Treatment Train Tool.
Stage Storage
Name Important to have a unique name, to connect it with the catchment area
Storage type Dry detention ponds
Bottom elevation (m) This is important to correspond with other components,
e.g. when the overflow is coupled to another BMP within a treatment train
Maximum depth (m)
Lined/unlined Unlined (ideally)
Underlying soil Choose from five; sandy soils drain more quickly.
Evaporation factor ?
Suction head (mm) ?
Saturated conductivity (mm/hr) ?
Initial soil moisture deficit (fraction) ?
Curves
The Curves table is designed to accommodate the side slopes. The top line begins at 0 m, with subsequent depths in the following lines.

Materials[edit]

Resilient turf grasses are particularly useful in the design of vegetated filter strips, dry ponds and enhanced grass swales. The Ministry of Transportation have standardized a number of grass mixes[12]. The 'Salt Tolerant Mix' is of particular value for low impact development applications alongside asphalt roadways and paved walkways.

Canada #1 Ground Cover (salt tolerant mix)
Common name Scientific name Proportion
Tall Fescue Festuca arundinacea 25 %
Fults Alkali Grass Puccinellia distans 20 %
Creeping Red Fescue Festuca rubra 25 %
Perennial ryegrass Lolium perrenne 20 %
Hard Fescue Festuca trachyphylla 10 %


Inspection and Maintenance[edit]

Comparison of Dry Pond and Wet Pond Maintenance Activities (MOE, 2003)
Maintenance Activity Dry Pond Wet Pond
Inspection
Grass cutting
Weed control
Removal of accumulated sediments
Upland vegetation replanting
Trash removal
Outlet valve adjustment
Shoreline fringe and flood fringe vegetation replanting
Aquatic vegetation replanting

Inspection points for dry ponds include (MOE, 2003):

  • standing water in pond after rain events for longer than designed detention time - may indicate outlet blockage
  • pond is always/relatively dry, even throughout designed detention time - may indicate inlet blockage
  • vegetation around the pond unhealthy or dying - may indicate poor species selection
  • visible sediment accumulation in the bottom of the pond or around the high water line of the pond - may indicate need for sediment removal
Protection Level 35% 55% 70% 85%
Basic 40 69 111 133


Gallery[edit]

External links[edit]

References[edit]

  1. 1.0 1.1 1.2 1.3 Ontario Ministry of Environment. 2003. Stormwater Management Planning and Design Manual. https://www.ontario.ca/document/stormwater-management-planning-and-design-manual/stormwater-management-plan-and-swmp-design
  2. Fairfax County. 2025. Understanding Stormwater Ponds: Wet Ponds, Dry Ponds and Stormwater Pond Retrofits. https://www.fairfaxcounty.gov/soil-water-conservation/understanding-stormwater-ponds
  3. TD & H Engineering. 2025. UPGF Storm Water Detention Pond. https://tdhengineering.com/project/upgf-multiuse-athletic-field-intermittent-storm-water-detention-pond/
  4. 4.0 4.1 4.2 City of Toronto. 2015. Landscape Design Guidelines for Stormwater Management Ponds. https://www.toronto.ca/wp-content/uploads/2017/11/913f-ecs-specs-landscape-Landscape_Design_Guidelines_SWM_Ponds_Sep2015.pdf
  5. 5.0 5.1 Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. 2015. The SuDS Manual. London.https://www.scotsnet.org.uk/__data/assets/pdf_file/0023/51764/CIRIA-report-C753-the-SuDS-manual-v6.pdf
  6. United States EPA. 2021. Stormwater Best Management Practice. https://www.epa.gov/system/files/documents/2021-11/bmp-dry-detention-ponds.pdf
  7. Lake Simcoe Region Conservation Authority. 2022. Technical Guidelines for Stormwater Management Submissions. https://www.lsrca.on.ca/wp-content/uploads/2023/06/Technical-Guidelines-for-Stormwater-Management-Submissions.pdf
  8. Gulliver, J.S., A.J. Erickson, and P.T. Weiss (editors). 2010. "Stormwater Treatment: Assessment and Maintenance. University of Minnesota, St. Anthony Falls Laboratory. Minneapolis, MN. https://stormwaterbook.safl.umn.edu/
  9. Ferguson, R.I. and Church, M. 2004. A simple universal equation for grain settling velocity. Journal of sedimentary Research, 74(6), pp.933-937. for settling solids. http://geoweb.uwyo.edu/geol5330/FergusonChurch_GrainSettling_JSR04.pdf
  10. MOEE (1994). Stormwater management practices planning and design manual. Ministry of Environment and Energy, Ontario, Canada.
  11. Muschalla, D., Vallet, B., Anctil, F., Lessard, P., Pelletier, G. and Vanrolleghem, P.A., 2014. Ecohydraulic-driven real-time control of stormwater basins. Journal of hydrology, 511, pp.82-91.
  12. Ontario Provincial Standard Specification. (2023). Construction Specification and for Vegetative Cover OPSS.PROV 803. Retrieved from https://tcp.mto.gov.on.ca/notice/000-0140