Line 11: |
Line 11: |
| '''The fundamental components of an enhanced grassed swale are:''' | | '''The fundamental components of an enhanced grassed swale are:''' |
| *Graded channel | | *Graded channel |
− | *[[Turf| Resilient turf grass]] | + | *[[Turf| Resilient turf grass]] or [[#Planting_Considerations|other planting]] |
| *[[Check dams]], to facilitate short term ponding | | *[[Check dams]], to facilitate short term ponding |
| '''Additional components may include:''' | | '''Additional components may include:''' |
Line 40: |
Line 40: |
| *33% height of vegetation for infrequently mown swales. | | *33% height of vegetation for infrequently mown swales. |
| |}} | | |}} |
− | ===Modeling===
| |
− | {{:Swales: TTT}}
| |
− | ==Materials==
| |
− | {{:Turf}}
| |
− | {{:Stone}}
| |
− |
| |
− | ===Check dams===
| |
− | '''[[Check dams]]'''
| |
| | | |
− | ==Planting Design Considerations== | + | ===Planting Considerations=== |
| *[[Grasses]] and herbaceous species with dense root structure cover should be favoured along the bottom of the swale for their ability to increase infiltration, stabilize soils, retain pollutants and assist with suspended solids. | | *[[Grasses]] and herbaceous species with dense root structure cover should be favoured along the bottom of the swale for their ability to increase infiltration, stabilize soils, retain pollutants and assist with suspended solids. |
| *The plant material on the slopes of grass channels must be capable of withstanding periodic inundation in addition to extended periods of drought. Species include grasses and groundcovers, as well as low shrub species. | | *The plant material on the slopes of grass channels must be capable of withstanding periodic inundation in addition to extended periods of drought. Species include grasses and groundcovers, as well as low shrub species. |
Line 59: |
Line 51: |
| *Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow. | | *Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow. |
| *The channel must be vegetated immediately after [[grading]]. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation. | | *The channel must be vegetated immediately after [[grading]]. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation. |
| + | |
| + | ===Modeling=== |
| + | {{:Swales: TTT}} |
| + | ==Materials== |
| + | {{:Turf}} |
| + | {{:Stone}} |
| + | [[check dams]] |
| | | |
| ---- | | ---- |