Changes

Jump to navigation Jump to search
m
no edit summary
Line 45: Line 45:  
{{:Turf}}
 
{{:Turf}}
 
{{:Stone}}
 
{{:Stone}}
===Check dams===
  −
{{:Check dams}}
      
==Planting Design Considerations==
 
==Planting Design Considerations==
Line 58: Line 56:  
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.  
 
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.  
 
*The channel must be vegetated immediately after grading. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
 
*The channel must be vegetated immediately after grading. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
 +
 +
===Check dams===
 +
{{:Check dams}}
101

edits

Navigation menu