Changes

Jump to navigation Jump to search
m
no edit summary
Line 8: Line 8:  
|width = 210px|Berm height (mm)||This is the height of the curb which constrains the overland sheet flow of water. <br> Where [[curb cuts]] or other [[inlets]] exists at the lowest point of an infiltration surface, the suggested value is 0.   
 
|width = 210px|Berm height (mm)||This is the height of the curb which constrains the overland sheet flow of water. <br> Where [[curb cuts]] or other [[inlets]] exists at the lowest point of an infiltration surface, the suggested value is 0.   
 
|-
 
|-
|Surface roughness (Manning’s n)||Lower numbers indicate less surface obstruction and result in faster flow. <br> Suggested range for a surface of decorative rocks 0.03 – 0.05 <ref name = SWMM> Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.</ref>
+
|Surface roughness (Manning’s n)||Lower numbers indicate less surface obstruction and result in faster flow. <br> Suggested range for a surface of decorative [[stones]] 0.03 – 0.05 <ref name = SWMM> Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.</ref>
 
|-
 
|-
 
|Surface slope (%)||If the slope &gt; 3%, consider using [[Check dams]] or weirs to prevent erosion of the surface under high flow velocities.  
 
|Surface slope (%)||If the slope &gt; 3%, consider using [[Check dams]] or weirs to prevent erosion of the surface under high flow velocities.  
8,255

edits

Navigation menu