Changes

Jump to: navigation, search

Groundwater

13 bytes added, 1 year ago
m
no edit summary
'''The target separation between the base of an exfiltrating LID practice and the water table is 0.9 m.'''
This is to mitigate risks due to short periods of groundwater monitoring and potentially unobserved seasonal fluctuations. In areas where a 0.9 m separation cannot be provided, or where conditions dictate that an even greater separation may be warranted, additional discussion and/or analysis specific to the physical characteristics of the site and the proposed design should be completed.

Navigation menu