Changes

Jump to navigation Jump to search
m
no edit summary
Line 10: Line 10:  
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
 
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
 
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
 
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
 +
 +
'''11 June 2018'''
 +
''The term "forebay" has a strong industry connection to SWM ponds, should this page have a different/more specific name?''
 +
*"Forebay" now redirects to the newly named [[Pretreatment features]] page as you suggest.
    
'''24 April 2018'''  
 
'''24 April 2018'''  
8,255

edits

Navigation menu