Changes

Jump to navigation Jump to search
m
no edit summary
Line 7: Line 7:     
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
 
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
*I have reviewed the equations on [[Permeable paving: Sizing]]
+
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. At this time time units have also been brought into line to millimeters and hours as used for the other BMPs.
    
'''24 April 2018'''  
 
'''24 April 2018'''  
8,255

edits

Navigation menu