Line 8:
Line 8:
*''RVC<sub>T</sub>'' = [[Runoff volume control target]] (mm)
*''RVC<sub>T</sub>'' = [[Runoff volume control target]] (mm)
*''R'' = ''A<sub>c</sub>''/''A<sub>p</sub>''; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas. R should not normally exceed 2.
*''R'' = ''A<sub>c</sub>''/''A<sub>p</sub>''; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas. R should not normally exceed 2.
−
*''f''' = Design infiltration rate (mm/hr)
+
*''f''' = [[Design infiltration rate]] (mm/hr)
*''t'' = Time to fill stone bed (typically 2 hr)
*''t'' = Time to fill stone bed (typically 2 hr)
*''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}}
*''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}}